Files
L'électron rare f55093d6fe
ESP-IDF CI / Host Tests (Unity) (push) Successful in 1m8s
CI / firmware-native (push) Successful in 2m57s
Rust Protection Tests / Cargo test (host) (push) Failing after 3m21s
ESP-IDF CI / ESP-IDF Build (v5.4) (push) Failing after 6m55s
ESP-IDF CI / Memory Budget Gate (push) Has been skipped
qa-cicd-environments / qa-kxkm-s3-build (push) Successful in 8m53s
qa-cicd-environments / qa-sim-host (push) Successful in 2m2s
qa-cicd-environments / qa-kxkm-s3-memory-budget (push) Successful in 11m17s
chore: import KXKM Batterie Parallelator
Context: the project archive (KXKM_Batterie_Parallelator-main) had
no git history locally; a fresh repository is needed to host it on
git.saillant.cc (electron/KXKM_Batterie_Parallelator).

Approach: initialize a new repo on branch main, stage the archive
content, and harden .gitignore before the first commit.

Changes:
- Import the full project tree: firmware/, firmware-idf/,
  firmware-rs/, iosApp/, kxkm-bmu-app/, kxkm-api/, hardware/,
  docs/, specs/, scripts/, models/, tests/
- Keep project dotfiles tracked despite the trailing '.*' ignore
  rule: .github/, .claude/, .superpowers/, .gitattributes,
  .markdownlint.json
- Extend .gitignore: firmware/src/credentials.h (local secrets,
  template kept), kxkm-bmu-app/**/build/ (66 MB compiled iOS
  framework), .remember/ (session data)

Impact: the project can now be maintained on the self-hosted Gitea
forge with a clean, secret-free initial history.
2026-07-04 12:32:28 +02:00

3.4 KiB

Assignation Agents et Tâches

Date: 2026-03-30 Statut: active (post-audit)

Matrice opérationnelle

Axe Agent principal Sous-agent/Support Sortie attendue KPI
Sécurité firmware BMU Safety Review SE: Security Findings classés + recommandations 0 régression critique
Gate QA/CI QA Gate SE: DevOps/CI Verdict PASS/FAIL + preuves runs preuves distantes archivées
Cartographie contexte Explore Context Architect Context map + dépendances couverture fichiers critiques
Implémentation code SWE gem-implementer Patchs vérifiés + tests tests verts + build stable
Documentation SE: Tech Writer Explore README/plans/specs synchronisés 0 contradiction statut
ML/Cloud orchestration SWE QA Gate Pipeline conteneur exécuté + artefacts run-container success
Audit CRIT fixes SWE BMU Safety Review Patchs CRIT-A..D + tests sim-host PASS + S3 build

Assignation par lot — Phase 4 (Audit Fixes)

Lot Priorité Owner Support Entrée Sortie
P0-UNIT-FIX P0 SWE BMU Safety Review CRIT-A + CRIT-B findings BatteryParallelator.cpp + main.cpp patchés
P1-DEADLOCK-FIX P1 SWE CRIT-C finding BatteryRouteValidation.cpp patché
P2-WEB-AUTH P2 SWE SE: Security CRIT-D finding Routes POST + token JS + #warning
P3-OVERCURRENT P3 SWE HIGH-1 finding fabs() dans ERROR handler
P4-LOCK-IMPL P4 SWE MED-1 finding Permanent lock implémenté
P5-TESTS-ALIGN P5 QA Gate SWE Tests stub vs code réel Tests alignés config.h (10A)
P6-HARDWARE-BENCH P6 Clément (manuel) BMU v1/v2 + PSUs + charges TB01-TB13 résultats

Assignation continue (P1)

Lot Owner Support Entrée Sortie
P1-README-SYNC SE: Tech Writer QA Gate plans + evidence récents README cohérent
P1-SCHEMA-CONTRACT ML Team SWE telemetry/inference payloads JSON schema versionnés
P1-CI-REMOTE-PROOF QA Gate SE: DevOps/CI workflow sur branche défaut URL runs + statut
P1-PDF-LIBRARY SE: Tech Writer 12 papers classés HIGH/MEDIUM/LOW organisés

Diagramme de responsabilités Phase 4

flowchart LR
  AUDIT[Audit 2026-03-30\n4 CRIT + 8 HIGH] --> P0[P0: SWE\nUnités + imbalance]
  AUDIT --> P1[P1: SWE\nDeadlock fix]
  AUDIT --> P2[P2: SWE + Security\nWeb auth]
  AUDIT --> P3[P3: SWE\nOvercurrent]
  AUDIT --> P4[P4: SWE\nPermanent lock]
  P0 --> TESTS[P5: QA Gate\nTests alignés]
  P1 --> TESTS
  P2 --> TESTS
  P3 --> TESTS
  P4 --> TESTS
  TESTS --> BUILD[Build validation\npio test + pio run]
  BUILD --> S3[S3: Clément\nBanc hardware]

Règles de fonctionnement

  1. Une tâche completed doit contenir une évidence vérifiable (commande, artefact, URL run).
  2. Une tâche blocked doit déclarer un unique Next Action exécutable immédiatement.
  3. Les sorties IA restent consultatives; la sûreté batterie reste locale firmware.
  4. Les changements sur plans/docs doivent être synchronisés dans la même itération.
  5. Nouveau: Aucun fix CRIT ne peut être marqué DONE sans test sim-host vert.

Escalade

  • P0: BMU Safety Review + QA Gate immédiat.
  • P1: Team owner + support associé.
  • P2: consolidation hebdomadaire par Tech Writer.
  • P6 (hardware bench): intervention Clément requise — seul lot nécessitant intervention humaine.