Files
Kill_LIFE/artifacts/evals/hypnoled_playbook_2026-03-25.md
T
L'électron rare b0517654ee feat: Hypnoled benchmark + JLCPCB BOM + playbook parity (Plan 25)
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-25 20:32:07 +01:00

5.4 KiB

T-HP-035: kicad-happy Playbook Parity Report

Date: 2026-03-25 Source BOM: /tmp/hypnoled-datasets/hardware/bom/DALI_PCB_bom.csv Analyzer: tools/industrial/bom_analyzer.py JLCPCB export: artifacts/evals/hypnoled_jlcpcb_bom_2026-03-25.csv


1. BOM Analyzer Output vs Forge Review

Dimension BOM Analyzer (bom_analyzer.py) Forge Review (Codestral, 2026-03-22)
Input CSV BOM (235 components, 98 unique) KiCad .kicad_sch schematics (6 files)
Focus Sourcing, LCSC matching, assembly Design correctness, safety, best practices
Output type Structured CSV + markdown report Free-text review with severity levels
Automation Fully automated, deterministic LLM-based, non-deterministic
Tokens consumed 0 (local Python) 9,067 tokens (3,636 in / 5,431 out)
API cost $0.00 ~$0.009 (Mistral Codestral)
Critiques found 0 (not in scope) 8 critiques, 7 avertissements, 18 recos
Sourcing info 8/98 LCSC matched, 70 need manual Not in scope

Key insight: The BOM analyzer and Forge review are complementary, not competing:

  • Forge catches design issues (wrong Zener rating, redundant ESP32, I2C address conflicts)
  • BOM analyzer catches manufacturing issues (unmatched LCSC parts, assembly blockers)
  • A complete kicad-happy playbook needs both passes

2. LCSC Matches Found

Component LCSC Category Est. Price
MB10S (BR1) C80907 Extended $0.04/pc @1k
1SMA4746 (D10) C191363 Extended $0.03/pc @1k
BSS123 (Q10) C82439 Extended $0.02/pc @1k
BC857 (Q9) C8586 Basic $0.01/pc @1k
10uF 0805 (C26,C27) C15850 Basic $0.004/pc @1k
4.7k 0603 (R1,R2) C25890 Basic $0.001/pc @1k
1K 0603 (R3) C21190 Basic $0.001/pc @1k
10K 0603 (R4,R5) C25804 Basic $0.001/pc @1k

Coverage: 8/98 line items auto-matched (8%)

Category Breakdown

Category Count Notes
Basic (JLCPCB) 25 Standard passives, common footprints
Extended (JLCPCB) 3 MB10S, 1SMA4746, BSS123
Unavailable / Manual 70 Specialty ICs, connectors, modules

3. Assembly Readiness Status

Status: BLOCKED

Blockers (top priority):

  1. 70 components without LCSC part numbers -- manual sourcing required for JLCPCB turnkey assembly
  2. Footprint errors detected:
    • C39 (0.1uF capacitor) uses Resistor_SMD:R_0201_0603Metric -- wrong footprint type
    • R10/R11 (10k resistors) use Capacitor_SMD:C_0201_0603Metric -- wrong footprint type
  3. Custom/proprietary footprints not in JLCPCB library:
    • DALI:* footprints (SOP245P670X290-4N, DIOM4325X250N, SOT230P700X180-4N)
    • tom_kicad_lib:* footprints (Jack, Audio amp)
    • easyeda2kicad:* footprints (various)
    • asukiaaa-kicad-footprints:* (solder jumpers)
    • KiCad:IRF3415STRLPBF (non-standard)

Recommended path to JLCPCB assembly:

Step Action Effort
1 Fix 2 footprint mismatches (C39, R10/R11) 15 min
2 Map 25 basic passives to JLCPCB preferred LCSC parts 1-2 hours
3 Source 15 common ICs (LDOs, op-amps, ESP32) on LCSC 2-3 hours
4 Evaluate 55 remaining parts: consign or substitute 4-6 hours
5 Convert custom footprints to JLCPCB-compatible 2-4 hours
6 Re-run DRC with JLCPCB design rules 30 min

Estimated total effort to reach assembly-ready: 10-16 hours

4. Playbook Parity Assessment

What kicad-happy playbook covers vs what was executed:

Playbook Step kicad-happy Reference Hypnoled Execution Parity
Schema review Forge prompts per sub-schematic 6/6 sub-schematics reviewed FULL
DRC check KiCad DRC + custom rules Not run (no .kicad_pcb in checkout) MISSING
BOM extraction kicad-cli or s-expression parser extract_hypnoled_datasets.py + bom_analyzer.py FULL
BOM normalization Deduplicate, normalize values 98 unique from 235 total FULL
LCSC sourcing Auto-match + manual fallback 8/98 auto, 70 need manual PARTIAL
JLCPCB export Comment/Designator/Footprint/LCSC/Qty CSV Generated: hypnoled_jlcpcb_bom_2026-03-25.csv FULL
Assembly gate All parts sourced + footprints valid BLOCKED: 70 unmatched + 2 footprint errors BLOCKED
Review report PDF + markdown with findings forge_review_DALI_PCB_2026-03-22.md + this report FULL

Parity Score: 5/8 steps complete, 1 partial, 2 blocked

To reach full parity:

  1. Run KiCad DRC on .kicad_pcb (requires board file in checkout)
  2. Complete LCSC sourcing for remaining 70 components
  3. Fix footprint errors and re-export

5. Conclusion

The kicad-happy playbook has been replayed on Hypnoled with the following results:

  • BOM analysis pipeline (parse -> normalize -> suggest -> report) works end-to-end
  • JLCPCB BOM export generated in correct format (5-column CSV)
  • Forge review and BOM analyzer outputs are complementary and both needed
  • Assembly status is BLOCKED until manual LCSC sourcing is completed for 70 parts
  • Two footprint errors found that would cause assembly issues (C39, R10/R11)
  • The bom_analyzer.py tool proves its value as a pre-fabrication gate check