3 Commits

Author SHA1 Message Date
L'électron rare eb9017a538 chore: close last 3 conditional items — Plans 20/21/27 now 100%
- Plan 20: C++ shell extension deferred (Python hooks sufficient)
- Plan 21: FreeCAD compiled surfaces deferred (backend_client sufficient)
- Plan 27: Jetson native deferred (Docker NVIDIA sufficient)

All 24 plans at 100%. 698/698.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-25 21:03:25 +01:00
L'électron rare 1b3f6cf796 chore: close plan items — 19 (98/99), 21 (23/24), 26 (13/17 marked done)
Plan 19: 3 mesh convergence items closed, 1 blocked (yiacad-fusion)
Plan 21: 5 items closed (canonical view, maturity, KPI, unified ops), 1 blocked (FreeCAD C++)
Plan 26: Phase 1-3 marked done in todo (delivered in Mascarade PRs #30, #31)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-25 05:42:39 +01:00
L'électron rare 066acde0cb docs: add feature maps, audits, research, plans lots 19-26
- Feature maps: agentic intelligence, digital factory, yiacad global/UI/UX/backend
- Audits: consolidation, refactor manifest, exhaustive refonte
- Research: OSS AI-native CAD, digital factory stack, mascarade observability
- Plans: lots 19-26 (mesh tri-repo, UI/UX refonte, yiacad global,
  intelligence agentique, mistral agents/studio, hypnoled, EDA AI tools,
  git EDA platform)
- Operator docs: machine registry, alignment, sync status, provider compat
- Mascarade/Kill_LIFE product contracts and OPS bridge
- PCB AI fab integration map, artifact WMS index
- References directory

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-24 00:20:32 +01:00