Deep regulatory research (15+ official sources, RTI 03.8.3 sheet read
in full): the TCP-to-VASP procedure is nailed down (13-item dossier,
seat reduction handled inside it, 86.90 EUR), but two blocking
uncertainties surfaced. First-registration date may forbid the
conversion or require a ministerial derogation, and no firm text
covers the sliding solar deck. Both flagged as blocking questions in
parcours-vasp.md and solaire-toit.md: DREAL first, fabrication later.